Hydraulic Piling Hammer - Case Study

HPH15000 Job Example - Amsterdam, Holland (2010)

DCP's 15k hammer driving tubes in Amsterdam Port supporting a new product pipe line jetty.

Tube length 34.5m 1220 dia. wall thickness 27.5mm thick.

PVE Vibro 2335 used to position pile 5m into the ground, then the 15k hammer was used to back drive to depth, total drive 29m to depth time taken 6mins.

Video > (click here)

 
/images/15k_037
/images/15k_038
/images/15k_039