Product Overview and Tech Specs
Advantages of the Dawson Capping System
Method of operation

Capping Equipment

The Capping System provides a fast economical method of supporting shuttering for capping beams on permanent sheet piling works such as: river banks; sea walls; piers; jetties, and flood alleviation work.

The system replaces the old fashioned, slow labour and material consuming methods. It greatly increases the speed of working with quick installation and removal. The equipment is re-used and does not cause damage to the steel sheet piles.

For example, a concrete cap 1.2m high by 0.9m wide and 275 metres in length was completed in four weeks. A 15m concrete pour was made every day. Five per week using a total of 45 Redeb support brackets and 18 soffit panels. Total whole job time saving?….2 weeks!

The system comprises of two key elements the Redeb Support Bracket and the multi-pile Soffit Shutter Panel.